LaserLine 5 m Direct Reading Optical Rod - Metric (#GR15M)

SKU:
GR15M
Shipping:
Free Shipping
$308.75
(No reviews yet) Write a Review

TOUGH - LIGHTWEIGHT - VERSATILE

LaserLine's Optical Grade Rods are the number one seller in the USA, and there's a reason - Tremendous Quality. Tough, lightweight, and versatile, these direct reading (lenker style) rods bear the true test of quality in the field, and hold up exceptionally well.

Optical Version Direct Reading/True Elevation Rod:
Is used with optical instruments and have no special rail for the laser detector. All tape faces have large scales and are easy to read at a distance when using an optical instrument.
 
 
FREE SHIPPING to the continental United States only!
 
Features
  • Aluminum front and rear rods: Made of high strength clear anodized aluminum for lightweight, rugged, dependable operation. They will not rust, split, splinter, swell or warp in any environment.
  • Tape has heavy duty matte textured face: Easy on the eyes in bright sunlight and protects the tape numbers from wearing and fading.
  • Oversized tape lock grommets: Heavy duty brass greatly minimizes the problem of tape tearing.
  • Solid tape lock with internal brake slide: Allows for a strong, trouble-free operation.
  • Tape lock pin cannot puncture tape: Designed not to tear, puncture or rip tape when pushed against tape face instead of the grommet hole.
  • DuPont nylon parts: Tough and rugged for long-lasting life. Same material used for ski bindings and motorcycle parts.
How it works
Direct Reading, or True Elevation (also known as Lenker style) is a Grade Rod with a moveable tape face. This allows you to set the actual benchmark elevation, or any elevation, above or below the bench into the rod. The actual true elevation above sea level, is read on these rods, thus eliminating errors caused by adding or subtracting. Since no math is involved, grade shots are much faster than conventional style rods. On most jobsites, the bench elevation is typically established by survey, and all elevations on that project are above that or below primary bench elevation.
                                                                          Read on rod as
Bench Elevation                         2352.50                  2.50
Bldg. A Footing Elevation         2351.50                  1.50
Bldg. B Finish Floor Elevation  2353.85                  3.85
Catch Basin #12                         2349.28                  9.28